DEVELOPING AN APPROACH TO DRAW UP RISK-INFORMED ROUTES FOR INSPECTIONS AT THE NPP
Keywords:
inspections, risk-informed inspections, in-service inspections (ISI)Abstract
There is a tendency in many countries of the world to switch from performing deterministic inspections to risk-informed ones. As a result of switching a problem to plan risk-informed inspection routes arises. An approach to draw the latter up is developed whose applicability is shown on the example of the pilot risk-informed inspection routes drawn up for the on-site inspector of the Armenian Nuclear Power Plant (ANPP).